Offering various FLEXIBLE and STRUCTURAL epoxies for your restoration needs
 
| 
| 
| 
Deck balustrade from interior side, note missing rail sections.
 | 
Exterior side of post bottom show extensive rot.
 | 
Hair dryers are used to dry out rotted wood areas before Epoxy 100 Consolidant is applied.
 |  
| 
Interior side, with epoxy being applied to affected areas.
 | 
Exterior side, Epoxy 200 Patch used to fill voids in balustrade.
 | 
Duplicated pieces of balustrade are inserted into voids on left, epoxied joints are secured during curing process.
 |  
| 
Poly covers keep rain water off of the epoxy during cure.
 | 
Balustrade interior after epoxy has been tooled.
 | 
Balustrade exterior with Epoxy 200 Patch tooled and ready for paint.
 |  |  |