Deck balustrade from interior side, note missing rail sections.
|
Exterior side of post bottom show extensive rot.
|
Hair dryers are used to dry out rotted wood areas before Epoxy 100 Consolidant is applied.
|
Interior side, with epoxy being applied to affected areas.
|
Exterior side, Epoxy 200 Patch used to fill voids in balustrade.
|
Duplicated pieces of balustrade are inserted into voids on left, epoxied joints are secured during curing process.
|
Poly covers keep rain water off of the epoxy during cure.
|
Balustrade interior after epoxy has been tooled.
|
Balustrade exterior with Epoxy 200 Patch tooled and ready for paint.
|
|
|